Control Room Panel Works

  • Safe removal of old panels during unit shutdown, following isolation procedures as per provided drawings and sketches.
  • Removal and rerouting of old cables to the new marshalling and DCS systems, ensuring precise disconnection per the provided diagrams.
  • Installation of newly designed panels in accordance with layout drawings.
  • Rerouting of old and new cables to the marshalling and relay panels, as per detailed drawings.
  • Conducting loop checks and commissioning of signals in line with loop diagrams and protocols.